LIST OF MAJOR COMPLETED PROJECTS SINCE 2001

Our Major Projects

No. Client Project Name Detail of Works Completion
01 Afroze Textiles Federal B Area, Karachi Factory Works Supply & Installation of:
  1. Cable Trays & Ladders
  2. Light Fixtures.
  3. Main LT Panel 600A.
  4. Various Distribution Boards Miscellaneous Electric works continuing.
2001/2003
02 Housing Enterprise Tariq Road, Karachi Model Sales Tax House – CBR Project Old Subzi Mandi Karachi
With NESPAK as Consultant.
Ground & First floor works comprising of supply & installation for following segments.
  1. Complete electrical work including Light fixtures, panels & DBs’.
  2. Complete telephone cabling and points.
  3. Termination, Testing, & Commissioning; and Fiber Optic cabling.
  4. Computer Networking with material, UTP.
2001/2003
03 Siddiq Sons Denim Mills SITE, Karachi Factory Works Electrical works, comprising of:
  1. Distribution Boards.
  2. Electrical Fixtures.
  3. Cabling.
  4. Other continuing works.
2002/2003
04 Lucky Textile (Pvt) Ltd Main Highway Road Landhi Karachi Processing Hall Area
  1. Supply and installation cable ladder
  2. Installation of Power Panel
  3. Power cable termination testing
  4. Supply of light Poles and installation.
  5. Commissioning of HT/LT Switch Boards.
2005
05 International (Pvt.) Ltd Korangi, Karachi Stitching Hall
  1. Light & Power installation
  2. Supply and installation of cable trays.
  3. Power cable Laying, testing and commissioning
  4. Switches and Power wiring.
  5. Supply and installation of Distribution Boards.
  6. Supply and installation of Ceiling Fan.
2006
06 Afroze Textiles Federal B Area, Karachi Factory Works Piping works:
  1. Hot water chiller piping network
  2. Gas fired absorption chiller piping networks
  3. Reciprocating chiller CFU piping.
2007
07 Kasim Textiles (Pvt) Limited Federal B Area, Karachi Factory Works MECHANICAL WORKS Complete Piping works:
  1. Installation of Transformers
  2. Installation of HT/ LT Switch Board.
  3. Commissioning of HT/LT Switch Board.
  4. Laying, termination, testing.
2007
08 Renfro Crescent (Pvt) Ltd Site Area Karachi Factory Works Installation Works
  1. Installation of Duplex type WHRB
2007
09 Renfro Crescent (Pvt) Ltd Site Area Karachi Installation of Direct Fired Cooling tower Absorption Chiller with Cooling Tower MECHANICAL WORKS:
  1. Installation of Direct Fired Absorption Chiller (Shaungliang 496 USRT).
  2. Installation of Cooling Tower-Liang Chi Cross Flow Cooling Tower.
  3. Installation of Chilled & Cooling Water Pump
  4. Supply & Installation of Exhaust Air Duct Piping
  5. Supply & Insulation of Cladding Work.
  6. Supply & Installation of Inter Connecting.
ELECTRICAL WORKS:
  1. Supply & Installation of MCC Panel.
  2. Supply & Installation of Cable Tray.
  3. Earthling System.
  4. Supply & Installation of Automatic Control.
2008
10 Afroze Textiles Federal B Area, Karachi Processing Unit and Weaving Unit ELECTRICAL AND MECH WORKS
  1. Piping Work.
  2. Supply and Installation.
2009
11 Shamsi Builders Limited Karachi. (a) Construction of Fyzee Rehmin Art Gallery and Auditorium.
(b) Construction of 384 Flats Authority (PHA) At Landhi For Pakistan Housing.
(a)Electrification of Building
  1. Installation of Standby Generators
  2. Installation of HT & LT Panels
  3. External Lighting System and Cable Equipment and Poles etc.
  4. Civil work for foundation & Earthling etc.
(b)Complete Civil & Electrical Works
2009
12 Khan Traders Karachi. Refurbishment of 8th Floor NBP Head Office Karachi. Civil, Electrical & Mechanical Works
  1. Complete Mechanical Work
  2. Complete Electrical Work
  3. External Lighting System and Cable Equipment and Poles etc.
  4. Civil work for foundation & Earthling etc.
(b)Complete Civil & Electrical Works
2009
13 Pollution Engineering Pakistan (Pvt) Ltd. Lahore Sewage Treatment Plant at Engro Chemical Pakistan. Civil, Electrical & Mechanical Works
  1. Complete Civil Work.
  2. Complete Mechanical Work.
  3. Complete Electrical Work.
2009
14 Pollution Engineering Pakistan (Pvt)Ltd Lahore CETP AT SUNDAR IDUSTRIAL ESTATE
  1. Electrification and Structure Cabling
2009
15 Lakson Tobaco Kotari Factory Hyderabad Electrical Work & Retrofitting
  1. Supply & Installation of Panels
  2. Fabrication.& Installation.of Cable Tray
  3. Remove & Installation of H.T Panels with works.
  4. Laying & Termination of H.T & L.T Cabling.
  5. Transformer 1250 KVA & 850 KVA
2009
16 Karachi Shipyard & Engg Works West Wharf Dockyard Road Karachi Up-Gradation Work Electrical & Mechanical Works Complete Up Gradation
  1. Custom & Design of H.T & L.T substation with supply & Installation testing &Commissioning of equipment.
  2. Complete Lights & Power Design.
  3. Supply & Installation of H.T & L.T Cables Works for Paint Shop. Short Blaster with Exposition Proof light & Fixtures.
  4. Complete design work with SS pipe/Installation of L.T Panel & Cabling for Block Fabrication area. North Quay Wall, Berth No.3 Line of Technical Gases Oxygen CO2, Natural Gases, compressing and water. Supply for Block fabrication and SWCD.
2009
17 Zadaf Private Limited Karachi. Civil/ Electrical & Mechanical Works
  1. Complete Civil Work
  2. Complete Lights & Power Design.
  3. Complete Elect. Works.
  4. Complete Mech. Works
  5. Infrastructure Development works Including Road works.
2012
18 International Textile Limited Karachi New Sizing Shed
  1. Supply & InstallationElectrification.
2011
19 International Textile Limited Karachi Bleaching Loop Dryer Machine Work
  1. Installation of Steam
  2. Condensate Distribution
  3. Supply & Installation System Piping
2012
20 ZADAF Private Ltd Karachi Administration Building and Ware House
  1. Construction Works
  2. Plumbing & Sanitary work
  3. Civil, Renovation works
  4. Electrical & Mechanical Works
2013
21 Karachi Shipyard & Engg Works West Wharf Dockyard Road Karachi Fire Fighting Works
  1. Supply & Installation of Piping Works
2013
22 National Bank of Pakistan (NBP) Construction of N.B.P. Branch at Mehar
  1. Construction Works
  2. Plumbing Works
  3. Electrical Works
  4. HVAC Works.
2013